Showing posts with label riverkeeper. Show all posts
Showing posts with label riverkeeper. Show all posts

Sunday, October 8, 2017

Photo essay: First ever Milwaukee boat parade

A lucky few got to witness firsthand on Saturday Milwaukee's first ever boat parade. If you were not among them then here you have it. Not as good as the real thing, but it'll give you a flavor. The event, which was billed as a first annual, was sponsored by Milwaukee Riverkeeper and Harbor District, Inc. and was held in conjunction with the annual Harbor Fest, which took place on Greenfield Avenue in front of the UWM School of Freshwater Sciences. Participating boaters were invited to decorate their boats and compete for prizes in two categories: paddle boats and motor or sail boats. The Milwaukee Riverkeeper boat (above) began at Lakefront Brewery, near the Holton Street Bridge on the Milwaukee River. It proceeded downstream, picking up boats along the way.


No, the cruise ships did not join the parade. The kayak did.

In addition to the large elephant (complete with squirting trunk) and human figures, this boat had a large band playing lively tunes.

This boat didn't win an award (I'm guessing it was hosted by one of the sponsoring organizations, which were ineligible) but it was my personal favorite. In case it isn't clear in the photos, the "fish" are fishing for humans!

The pirate canoe in the foreground won second place in the paddler category.
 
Johnny, wearing the banana costume in the shark kayak, received the first place award in the paddler category.

Kudos to all who participated. If you're a boat owner, watch for next year's boat parade! 

Full disclosure: I am a former board member of Milwaukee Riverkeeper and the current artist in residence for the Harbor District, Inc.


Sunday, April 23, 2017

Annual Earth Day river clean up

Yesterday was a most beautiful day for a river clean up. If the few sites I managed to get to were an indicator of participation then we had a great turn out for it, too. The clean up is sponsored by Milwaukee Riverkeeper and there were many sites along all of our rivers. I stuck to the Milwaukee River. Started at Lincoln Park and made my way downstream to Caesar's Pool, although by the time I got to the end it was indeed the end and the volunteer staffers were heading off to the after party at Estabrook Park. Here are are few of my photos. More can be seen on Flickr.

Members of girl scout troop 20055 lend each other a helping hand. Lincoln Park.

Lincoln Park




























Lincoln Park

























Lincoln Park




























Estabrook Dam




























Members of Chinmaya Bala Vihar Hindu community at Estabrook Park
























Estabrook Park





























This chalkboard has to be the catch of the day! Hubbard Park.



























Bicycle cop on the West Bank Trail at North Avenue.





























Wrapping up for the day at Caesar's Pool.















































See the complete Earth Day river clean up album on Flickr.

Tuesday, April 21, 2015

Earth Day: A community cleans up the KK

-->
Which do you think is the more powerful metaphor?

A) While picking up trash along the concrete-lined Kinnickinnic River I found a framed print of exotic waterfowl discarded in riverside bushes.


B) Two hundred community members turned out last Saturday to pick up trash along a stretch of their river that has been little more than a drainage ditch for over 40 years.


The irony of the sentimental wildlife print discarded near the degraded river is good for a chuckle, but I choose B as the more important metaphor. The KK River Neighbors Association and the 16th St. Community Health Center turned people out in force to join in the annual Earth Day cleanup sponsored by Milwaukee Riverkeeper. The symbolism is clear: the community cares about its environment and is hopeful about the future of its maligned waterway.

The reason for that hope is as concrete as the river channel: The Milwaukee Metropolitan Sewerage District has begun a multi-year project to remove said concrete channel and restore a more natural flow to the Kinnickinnic River. Judging from the enthusiastic comments I heard repeatedly on Saturday, the community is thrilled at the prospect.


Acres of cleared land between Harrison Street (background) and the KK River (behind me) are evidence of progress on MMSD’s rehabilitation project. After houses in the flood-prone area are purchased and demolished the concrete channel will be removed and the river reconfigured within a landscaped park.

After two hours of picking up trash near the river and throughout the neighborhood on either side everyone gathered at another concrete symbol of the river’s revitalization. The concrete channel, which until recently extended east to the I-94 overpass, now ends just shy of the 6th St. Bridge. The first phase of the MMSD project was completed in 2011. In addition to removing the concrete channel a newly dedicated KK River Trail was created alongside the rehabilitated stream.


A huge crowd that included cleanup teams from several sites on the KK gathered along the 6th St segment of the KK River Trail for a “Trash Bash” organized by the event sponsors. Free pizza and burritos were available to all. There were family-friendly interactive displays related to water and the river. A team of scientists from UW—Madison were on hand to help folks learn more about their river.

The UW team provided hip waders for the public to borrow so that they could physically immerse themselves in the river. “Having kids and adults connect with the river in that way is huge,” said Iris Gonzalez, one of the organizers from the 16th St. Community Health Center. “Most of them were very hesitant to try but, after watching others (in some cases their own children), they were convinced. It is experiences like feeling the pressure of the water against your body, or the waders suck onto your legs when you step in and seeing fish and fish eggs up close that foment a spirit of stewardship.”


Local children spray water onto a watershed model that illustrates how water flows are affected by varying slopes, soils and vegetation conditions.

The success of the “Trash Bash” in bringing the community down to the river, to activate the new trail and to celebrate the transformation that is underway was a major achievement. Many in the neighborhood had not ventured there before, according to Gonzalez. However, she told me proudly, “I know they will be back!”

The event culminated in a spectacular demonstration of hydraulic flows and river dynamics. Peter Levi, the UW limnologist heading the team of scientists, poured red dye into the river just east of the 6th St. Bridge. At first the dye turned the water bright scarlet and then expanded to fill the width of the river. The dye gradually dissipated as it swirled downstream, around rocks and settled into pools. It was a crowd pleaser and a lovely end to the Earth Day river cleanup.


A brief series of photos from the day follows.










To see even more photos from this event go to my flickr album.

Full disclosure: I am substantially connected to many of the organizations responsible for the cleanup and KK River Project because the work they are doing is dear to my soul. As a former board member of Milwaukee Riverkeeper I have participated in most (if not all—I don’t quite recall) of their 20 annual river cleanups. I am working with the MMSD to document the current phase of the KK River Project. On top of that until recently my daughter, Chelsea, was employed by the 16th St. Community Health Center. And Chelsea brought my only (so far) granddaughter to help out with the cleanup. She’s only 3 years old, so she mostly played on the Cleveland Park playground and ate pizza at the Trash Bash. Hey, I said “full disclosure!” Oh, and Chelsea took my picture with this funny-looking fish.


More photos on flickr.

Tuesday, September 2, 2014

Public hearing on fate of Estabrook Dam tomorrow

-->
Courtesy: Milwaukee Riverkeeper
I am forwarding the following from Milwaukee Riverkeeper. Please consider attending the public hearing (details below) or sending a message to your county supervisor (contact info below).

Help Us Remove the Deadbeat Estabrook Dam!

-->
Quick Facts about Estabrook Dam:

1) Milwaukee County built the Estabrook Dam in 1937 to elevate water levels for recreation (following some blasting of bedrock to alleviate flooding). Milwaukee County failed to maintain and repair the Dam per State Dam Safety regulations over the years. In 2009, the gates were ordered permanently open by the Wisconsin Department of Natural Resources (WDNR) due to hazardous conditions.  

2) Recent studies of the Dam have shown that it increases flooding upstream, poses a liability for Milwaukee County, and will lead to increased flood insurance costs for upstream residents.

3) The ecological health created by a free flowing river offers greater long term value than maintaining the present impoundment behind the Dam. Dam removal will: a.) allow fish to swim to upstream spawning habitats and restore the natural and wild aspect of the Milwaukee River; b.) reduce flooding upstream of the Dam; c.) improve water quality upstream of the Dam; and d.) improve recreational opportunities such as fishing and paddling.

4) Over $8 million has been spent upstream to improve access for fish to spawning habitat via dam removal and construction of fish passage structures.  The removal of the Estabrook Dam would expand the benefits of those projects.

5) County consultants estimate it will cost 3 times as much to repair than remove the Dam if maintenance costs of $2.6 million are included for the next 20 years (the estimated life expectancy of the Dam). These costs do not include the administrative costs associated with state and federal permitting required for the Estabrook Dam.

How You Can Help!

1) Attend the County’s Public Information Meeting on the draft Environmental Assessment:

Wednesday, September 3, 2014, 6:00 PM – 8:00 PM
Nicolet HS (Cafeteria)

2) Contact your County Supervisor and the County Executive and tell them that Estabrook Dam should be removed (contact info on back). The County Board Parks, Energy and Environment Committee will vote on a "preferred alternative" for the Dam at their meeting on Tuesday, September 9th. The full Milwaukee County Board will vote on their preferred alternative on Thursday, September 18th.  Public comments on the draft EA will be accepted by the County through September 17th at surveymonkey.com/s/EstabrookDamComments.

3) Attend the County Parks, Energy, and Environment Meeting on Tuesday September 9th. The Agenda is posted one week in advance, but this meeting typically begins at 9 AM at the Milwaukee County Courthouse, Room 301-B.

4) The WDNR and Bureau of Land Management (who owns some of the land the dam sits on) have both indicated that they will hold a public hearing to fulfill state and federal permitting requirements pertaining to dam operations and construction. We will publish information as it becomes available. 

5) To receive more information, please email: christina@milwaukeeriverkeeper.org and keep up-to-date on our facebook page, or our website at: http://milwaukeeriverkeeper.org/content/estabrook-dam-removal.  


To find your supervisor go to:
http://cts.vresp.com/c/?PreserveOurParks/9e7fec6aa7/3865a739aa/42340b9b41 and click on “Find Your District or Supervisor.”
Then click on the photo of the supervisor to get to contact information.



(Full disclosure: I was formerly on the board of Milwaukee Riverkeeper.)

Thursday, August 28, 2014

Kayaking the Menomonee with Milwaukee Riverkeeper

This week Milwaukee Riverkeeper hosted the second in a series of three kayaking expeditions. Each has been meant to explore one of Milwaukee's three rivers. The first, in July, headed up the Milwaukee River. This time it was the Menomonee. The third will tour the Kinnickinnic River on September 30. (For information or to register, click here.) 

Jennifer Bolger Breceda, Milwaukee Riverkeeper's new Executive Director joined us for the tour guided by Cheryl Nenn, who is the official riverkeeper. Thanks go out to the Milwaukee Kayak Company for supplying the kayaks and supporting Riverkeeper.

I went along to document the event and to provide a water's-eye view of the Menomonee Valley.  Here is my photo essay.


We put in off the Milwaukee Kayak Co. slip at 318 S. Water St., near the rustic (and rusty) railroad swivel bridge in the Milwaukee River.



It was a beautiful evening and we were passed by several cruise lines before we reached the Menomonee River.




Two of our expedition beneath the railroad bridge at the confluence of the Menomonee with the Milwaukee.


The 2nd St. Bridge follows immediately after the RR bridge.



Instead of proceeding up the Menomonee proper, we turned the corner into the Menomonee Canal and past the Harley Davidson Museum.


The Global Water Center from the water.


Paddling past the Reed Street Yards.


The newly opened Hank Aaron State Trail ramp provides access from the Sixth Street Bridge down to the Reed Street Yards segment of the trail.


Brandon is one of the Milwaukee Kayak Co. staff.




Beth is the owner of Milwaukee Kayak Co.



Cheryl Nenn, Milwaukee Riverkeeper, provided a running commentary as we paddled.


Jennifer Bolger Breceda, Executive Director of Milwaukee Riverkeeper as we entered the Burnham Canal.

There are a few additional photos of the event in my Menomonee Valley flickr album.

(Full disclosure: I was formerly on the board of Milwaukee Riverkeeper.)

This post is one in a series that relates to my Menomonee Valley Artist in Residency. For more information about the residency and links to previous posts and photographs, go to MV AiR.